|
pinEdit Evaluation 6.1.1029
Expert
Engineering Enables Long-Lasting, Money-Saving Roof
Performance

Smart, coordinated engineering
and design is not only the essential enabler for the
other “E’s” of High-Performance Roofing, it is the key to
what the Department of Energy calls “whole-building
design,” which integrates all the subsystems and parts of
the building to work more effectively together from
“cradle to cradle.”
Stringent measures help ensure that the highest level of
quality control is implemented throughout the manufacturing
process. From raw material selection to job site delivery, at
least 14 different Duro-Last personnel inspect, evaluate, and
qualify the materials and processes that are used to produce
the Cool Zone roofing system.
Every Cool Zone roof is engineered as a completely integrated
system, prefabricated to the exact measurements of each
building. Not only is up to 85 percent of membrane seaming
completed in a factory-controlled environment, roof stacks,
flashings, and edge details are also completed at the factory
and shipped to the building site as part of the complete
roofing system. The few remaining seams are then hot-air welded
on-site by an approved contractor and inspected by a Duro-Last
technical representative before a warranty is issued.
GEMSOR Roofing Inc. provides such services in GTA,
Brampton, Mississauga, Oakville, Toronto, Burlington, Hamilton,
Georgetown, Acton, Richmond-Hill, Vaughan and surrounding
areas.
Thanks to the precision fabrication of the Cool Zone roofing
system, installation is much faster and less disruptive than
for a typical “roll-goods” roof. The installation process is
quiet, with no noxious fumes or flames, so building occupants
can continue with their regular routines.
Back to Home
Page
|